Installation of siding panels for exterior wall openings of houses with strip panels Installation of vinyl siding lathe In order to make the outer wall smooth, tidy and high-quality, many requirements must be met during the installation process. Wall panels can be installed on any type of wall. The only restriction is that the foundation must be sufficiently strong and level. If the lathe is not used during installation, it is important to choose the correct installation method. Self-tapping screws or nails can be used for wooden walls. The dowels are pre-installed on the surface made of concrete, bricks, and building blocks, and then the panels are fixed with the help of them. The direction of the bar is arranged horizontally with the ordinary panel; 4-base made of waterproof plywood or slats; 5-bar wall 6-common panel; 7-pin (made of wood or nylon); 8-brick; 9-old Finishing (made of lining); 12-level 12-construction line. for
When installing wall panels without laying out a lathe, the base has been pre-leveled. It must be sturdy, not fragile, without cracks, and damaged areas. Panels can be installed during the construction and renovation of the house. If the condition of the old cladding is satisfactory, it may not be possible to remove it. The project can be carried out at any temperature. Severe frost is an exception, during which the panel may become fragile.
When using siding, please consider whether the finished cladding is leaking. In order to protect the walls of the house from moisture, please impregnate them with corrosion protection. You can use waterproof membranes and waterproof membranes, and install insulating materials.

restriction
Houses under construction and already in use can be fitted with wall panels on the crates. The base helps to align the wall. It allows you to place additional insulation. In a house under construction, the construction work must be completed first, and unnecessary fasteners, nails, protruding elements of the reinforcement cage, etc. must be removed.
In the houses that have been used, the platform belts at the door and window openings, door frames, and low tide have been removed. Boards that are in poor condition will be replaced. All boards must be flush with no protrusions or depressions.

For siding, please use wooden or metal crates. Gunlock gildersleeve Choose the length of the strip or band to correspond to the height. This fit is particularly important for log walls that are difficult to align vertically. them
The width of the slats is selected according to the distance between the nail holes of the side panels. The bar should be 2 times wider than this distance. In this case, the fastener will be centered in the groove on the side panel. This will protect the cladding from deformation during sudden temperature fluctuations. The metal crates are assembled from galvanized steel profiles. Its price is 2-3 times that of wood, but it is stronger and more durable. When installing the side panel, its fixing hole must be above the galvanized profile. In particular, they are installed along basements and cornices, corners around openings. The distance between wooden strips or metal profiles is 41 cm. They attach every 51-71 cm.

If the house is located in an area with increased wind load, the distance between the bars or profiles will be reduced by 1.5-2 times. Fasteners are made more frequently to increase the strength of the structure.
reduced
If the side panels have not been selected, and their dimensions have not been determined at the corners and around the door and window openings, assemble the crate from waste materials and short pieces and place it perpendicular to the direction of the long strip. It will be easier to attach additional elements and accessories to them. If you know the size of the panel in advance, install a standard lathe around the opening and at the corners. The distance at which the last slat in the row is placed corresponds to the length of the nail strip.
If the door and window openings go deep into the wall, the crates around them will be assembled in a standard way and cover the slope surface with them. Lathe for installing vinyl siding perpendicular to the panel. For horizontal siding, the strips are fixed vertically, for vertical-horizontal fixing. If the frame is assembled from wooden boards and slats, it must be fire-protected and dried. They define the level to which the strip or metal profile will be aligned later. Use cables and building level to check the correct installation of the beacon. If you need to increase the distance between the wall and the crate, you can place a short strip under it. If you need to reduce the distance, use a thin rod or cut off a part of its surface. The correctness of installation in small houses is controlled by the level of the building. For large buildings, it is more convenient to use a laser level for this purpose. After installing the lathe, the outer wall is insulated and waterproof. The waterproof sheet is fixed on the strips, and the insulating layer is located between the strips. How to Replace Damaged Vinyl Siding | Ask This Old House